Finishing Tests
- On-site mortar system test pursuant to Israeli Standard SI 1920, Part 2
(Exterior and interior mortar; vertical, plane, and wave tests; and axial pull adhesive strength test) - Rigid natural stone cladding systems test pursuant to Israeli Standard SI 2378 and all its parts
Israeli Standard SI 2378, Part 2 – Natural stone clad walls: wall cladding by wet fixing
Israeli Standard SI 2378, Part 3 – Natural stone clad walls: wall cladding by dry fixing
Israeli Standard SI 2378, Part 4 – Natural stone clad walls: wall cladding by combined adhesive-mechanical method
Israeli Standard SI 2378, Part 5 – Natural stone clad walls: prefabricated cladding elements and industrial onsite cladding methods
Israeli Standard SI 2378, Part 6 – Natural stone clad walls: wall cladding by double wall method - Rigid natural stone cladding by artificial stone units intactness test pursuant to Israeli Standard SI 1872 and all its parts
Israeli Standard SI 1872, Part 2 – Artificial stone cladding: wall cladding by wet fixing
Israeli Standard SI 1872, Part 4 – Artificial stone cladding: wall cladding by combined adhesive-mechanical method
Israeli Standard SI 1872, Part 5.1 – Artificial stone cladding: prefabricated cladding elements and industrial onsite cladding methods – fixing cladding units by metal accessories
Israeli Standard SI 1872, Part 5.2 – Artificial stone cladding: prefabricated cladding elements and industrial onsite cladding methods – fixing cladding units with drawback - Mosaic and ceramic tile flooring and cladding systems test
Israeli Standard SI 1555, Part 1 – Mosaic and ceramic tile for building flooring and cladding: exterior cladding
Israeli Standard SI 1555, Part 2 – Mosaic and ceramic tile for building flooring and cladding: interior cladding
Israeli Standard SI 1555, Part 3 – Mosaic and ceramic tile for building flooring and cladding: flooring
Israeli Standard SI 1555, Part 4 – Mosaic and ceramic tile for building flooring and cladding: ceramic tile cladding by dry fixing - Adhesive thickness and strength of the exterior and interior thermal mortar systems of buildings test pursuant to Israeli Standard SI 1414 and all its parts
- Anchor bolt extraction, dowel extraction, anchors, bolt, and pin strength tests pursuant to the engineering specifications of the system designer
- Paint and galvanized thickness test of metal construction pursuant to the engineering specifications of the system designer
- Systems test of coatings and cladding of protected spaces pursuant to the specifications of Israeli Standard SI 5075
- Sealing test for air raid shelters and protected spaces pursuant to the specifications of Israeli Standard SI 4577
- Ventilation and filter systems test of the air in air raid shelters pursuant to the specifications of Israeli Standard SI 4570 and all its parts
- Central antenna test pursuant to the specifications of Israeli Standard SI 799
- Lightening rod test pursuant to the specifications of Israeli Standard SI 1173
- Railings and backrest test pursuant to the specifications of Israeli Standard SI 1142 – geometry and strength